Progress Photos   

July, 1999: C.F. Jordan, the General Contractor has begun construction in earnest. Roughing-in of the plumbing, electrical and HVAC systems and the "drying-in" of the building are all well underway. The locations for the stud walls are being determined and the bottom track, and in some cases the studs, are in place. Holes are being drilled though the floor slabs for new plumbing and other vertical components.

Click on any image or the caption to see a larger image

MVC-004F.jpg (10493 bytes)
Electrical Service Entrance

MVC-005F.jpg (8120 bytes)
"Shake Out" area from above

MVC-013F.jpg (8465 bytes)
Framing on Guest Room Floor

MVC-010F.jpg (9191 bytes)
Vertical Shaft

MVC-009F.jpg (8180 bytes)
View Down Corridor Framing

MVC-018F.jpg (7602 bytes)
Guest Room Baths, Bottom Track

MVC-015F.jpg (6515 bytes)
Cored Holes for Plumbing

MVC-008F.jpg (9896 bytes)
Stud Wall Framing

MVC-022F.jpg (8113 bytes)
"Hat" Channels on Ceiling